Spin the Wheel Mission Order of Power Flow
The Order
Power must be rerouted through systems to relieve strain on EPS conduits.
The following systems are available for this process:
The order for the Legacy of Romulus release is:
1. Replicators
- Environmental Controls
- Gravity
- Defense
- Environmental
- Replicators
This guide was created by its original author on the Steam Community. Are you the author and want it removed? Request removal.